Wima Recycling
Request Quote

Safe and professional demolition works for industry and construction

Complete and selective demolition of industrial buildings, factory halls and agricultural structures. With source sorting and full OVAM documentation.

Your specialist in demolition works

Wima Recycling has years of experience in the selective demolition of industrial buildings, factory halls, storage facilities and agricultural structures. We deploy modern machinery and a certified team to safely and efficiently execute your demolition project.

Our approach is always selective: we sort materials at the source, separate reusable fractions and process all waste streams in accordance with OVAM regulations. You receive all necessary documentation as standard.

From a single building to a complete industrial site: Wima Recycling handles projects of any scale in the Waasland region and beyond.

Wima demolition industrial works

Our demolition services

From a single building to a complete industrial site — we have the expertise and equipment for every project.

01

Complete industrial demolition works

Complete demolition of factory halls, production buildings and industrial complexes. From the first machine to the last foundation.

02

Selective deconstruction

Accurate separation of materials at the source for maximum recycling value. Steel, concrete, wood, and insulation are processed separately.

03

Concrete demolition and foundation

Professional demolition of concrete floors, foundations, and reinforced concrete with specialized machines and breakers.

04

Dismantling of installations

Disconnection and removal of machines, pipelines, electrical installations, and process equipment on industrial sites.

05

Agricultural constructions

Demolition of barns, greenhouses, silos, and other agricultural structures with proper processing of all materials released.

06

Prepare site for construction

Thoroughly preparing land for construction, including leveling work, removal of debris, and preparation for new construction or redevelopment.

Hoe wij te werk gaan

A structured approach from preparation to final delivery guarantees safety and quality.

01
Advies en inspectie

We visit your location for a thorough inspection of the structure to be demolished. Based on this, we prepare a detailed quote and approach.

02
Permits and documentation

We guide you through the necessary demolition permits and provide all OVAM documents, including the selective demolition inventory where required.

03
Preparation and asbestos inspection

Before commencement, hazardous substances such as asbestos are inventoried and removed by recognized specialists in accordance with legal obligations.

04
Execution of demolition works

Our experienced team carries out the demolition work with the right machines. Sorting of materials is done directly at the source for maximum recycling value.

05
Removal and processing

All released materials are correctly disposed of and processed through our own recycling site or recognized partners. You will receive all certificates and weighing slips.

06
Terrein oplevering

After the demolition work, the site is left clean, ready for development or redevelopment. A final report formally closes the project.

Why Wima for your demolition project

VCA and OVAM certified

Our team works in accordance with the VCA safety guidelines and all OVAM regulations for demolition waste.

Own machines and crews

No subcontractors but our own experienced teams with modern equipment for complete control over quality and planning.

Sorting at the source

By sorting during the demolition work, we maximize the recycling value and reduce the processing cost for you as the client.

Total service from A to Z

From advice and permits to demolition work, transport, and processing: Wima Recycling handles everything internally as your single point of contact.

Industrial demolitionwerken Wima Recycling

Request a quote for your demolition project

Contact us today for a free, no-obligation quote. We will assess your project and provide a clear proposal within 24 hours.

Request Quote